Skip to main content

Our Services

What We Do

We build detached accessory dwelling units in Tacoma, from site preparation through to the finished interior, working to the city’s zoning and setback standards.

architecture

Plan Selection

Working through which of the City’s four pre-approved detached models, or which independently drawn plan, suits your lot.

construction

General Construction

Full-scope construction of your detached accessory dwelling unit.

foundation

Site Preparation

Excavation and foundation work for the rear-yard conditions on your lot.

home_repair_service

Utility Connections

Water, sewer and electrical connections, which a detached unit needs in its own right.

door_front

Interior Finishing

Completing the interior, from framing through to the final coat of paint.

roofing

Exterior Shell

The structural shell, roofing and exterior siding.

Prairie Line ADU Co. - General Construction

About Us

ADU Construction in an Old Port City

Tacoma was incorporated in 1875 around the deepwater port at Commencement Bay, and it has nine historic districts to show for it. The North Slope alone holds more than 950 properties, most of them built before the Second World War. That is the housing stock we work behind.

The rules changed underneath all of it. Washington’s HB 1337 (RCW 36.70A.681) required cities to allow two accessory dwelling units on lots that allow single-family homes, and on 1 February 2025 Tacoma’s Home in Tacoma zoning took effect and replaced single-family zoning citywide.

  • Two ADUs are permitted on a legally established lot, attached or detached.
  • Habitable area is capped at 1,000 square feet, excluding garages and other non-living areas.
  • Owner-occupancy is not required to build — though it does apply if you intend to run either unit as a short-term rental.
  • No off-street parking is required, and existing spaces may be removed to make room.

We are a construction business and nothing more. We do not draw plans, and we do not submit, file or expedite anything with the City.

map
Alley Access

No setback is required from an alley in Tacoma. On older platted lots that shapes where an ADU can sensibly go.

fact_check
The Rules As Written

Two ADUs per lot, 1,000 square feet of habitable area, no owner-occupancy requirement to build. We work to what the code actually says.

house
Detached Units

We build detached ADUs in rear yards, including sites where an existing structure is being replaced.

Why Choose Us

How We Work on Tacoma Lots

verified

Straight About the Plans

The City’s pre-approved detached ADU plans belong to the City, not to us. We explain what they cover and what they do not.

fact_check

Permits Are Still Required

A pre-approved plan is not pre-permitted. Every project goes through site-specific review, and we say so before you spend anything.

schedule

One Stage at a Time

Design, site preparation, shell, utilities, finishes. We tell you what happens in each stage and what has to be settled before the next one starts.

location_on

Alleys and Older Plats

Tacoma requires no setback from an alley. On an older platted lot that is often the difference between a workable ADU and a cramped one.

Choosing ADU Contractors in Tacoma WA: Five Things Worth Asking

The ground shifted in February 2025

If you are looking for ADU contractors in Tacoma WA, it helps to know what changed. Washington’s HB 1337 (RCW 36.70A.681) required cities to allow at least two accessory dwelling units on lots that permit single-family homes. Tacoma’s own answer, the Home in Tacoma zoning, took effect on 1 February 2025 and replaced single-family zoning across the whole city. Five things are worth asking any builder you talk to.

1. Do they know what the 1,000 square feet actually covers?

The cap is on habitable area, and it excludes garages and other non-living space. It is a limit on the unit, not a promise about your lot: the ADU still has to satisfy the lot size, density, height and setback standards of its zoning district. A builder who quotes the number without the conditions has only read half of it.

2. Are they straight about the pre-approved plans?

The City publishes four base pre-approved detached ADU models, with two roof types and siding options, and they genuinely do streamline permitting. But the City states plainly that a pre-approved plan is not pre-permitted. Permits are still required, and site-specific review still happens for utilities, critical areas, historic districts and fire access. Those plans belong to the City. No builder holds them, and no builder should suggest they can move you to the front of a queue.

3. Have they looked at your alley?

Much of Tacoma was platted before the war, and those neighbourhoods have alleys running behind them. Tacoma requires no setback from an alley, against 15 feet from a rear property line otherwise. On a tight lot that single rule often decides whether a detached unit fits at all. It is the first thing worth walking out to look at.

4. Do they understand the owner-occupancy position?

You do not have to live on the lot to build an ADU in Tacoma. There are two situations where occupancy does come back into it: running either unit as a short-term rental, and taking the optional Home in Tacoma incentive package, which carries a recorded title restriction. Anyone telling you occupancy never matters has skipped both.

5. Is your house in a historic district?

Tacoma has nine of them. Where the historic standards conflict with the building design standards, the historic standards take priority — and the older neighbourhoods with the best alley access are exactly the ones most likely to sit inside a district. Better to find that out before a plan is chosen than after.

Ask any contractor for their Washington L&I registration before you sign anything. It takes a minute to check and it is the homeowner’s own protection.


Talk to us about your lot

If you are weighing up a detached ADU in Tacoma and want to know what your lot actually allows, call us on (253) 242-8730 or email [email protected]. We will tell you what the rules permit before anyone talks about a build.

Frequently Asked Questions

What are the current ADU regulations in Tacoma?

Two accessory dwelling units are permitted on a legally established lot, attached or detached, and the habitable area of each is capped at 1,000 square feet excluding garages and other non-living space. You do not have to live on the lot to build one. This came in with Tacoma’s Home in Tacoma zoning, which took effect on 1 February 2025 under Washington’s HB 1337.

Two caveats worth knowing. Owner-occupancy does apply if you intend to operate either unit as a short-term rental. And the 1,000 square feet is a limit on the unit, not a guarantee about your lot — the ADU still has to meet the lot size, density, height and setback standards of its zoning district. The City’s planning department is the place to confirm how that lands on your specific address.

Are the City's pre-approved plans actually pre-permitted?

No. The City states it directly: a pre-approved plan is not pre-permitted. The four base models are already reviewed against building, residential and energy codes, which is what streamlines the permitting, but a permit application is still required and the project still goes through site-specific review.

That review covers the things a plan cannot know about in advance — utility service, critical areas, historic districts, proximity to fire hydrants. Those plans are the City’s, not ours. We have no relationship with the City, and we never draw plans, submit applications or file anything on your behalf.

What is the typical cost range for an ADU in Tacoma?

It depends on the size of the unit, the condition of your site and the finishes you choose, and we will not put a number on it before we have stood on the lot. What we can tell you is where the money tends to go on a Tacoma detached unit.

A detached ADU needs its own water, sewer and electrical service, and on an older property that can mean upgrading the main panel or extending a line further than expected. Permit fees, impact fees and system development charges sit on top of construction cost. Modifications to a pre-approved plan also carry separate designer fees payable to the designer, not to us. Budget a contingency — older lots turn up surprises once the ground is open.

What is the typical timeline for an ADU project?

Two phases, and the first is not in anyone’s hands but the City’s. Permitting depends on the department’s current workload and on how complicated your site-specific review turns out to be. Using a pre-approved plan shortens the review of the building itself; it does not remove this phase.

Construction then runs several months depending on the size of the unit and what the site demands. Weather, material availability and the timing of utility inspections all move the end date. We will give you a schedule based on the conditions we actually find, and we will tell you when something changes it.

Do I need to hire an architect for my ADU project?

If you use one of the City’s pre-approved detached models, the building itself is already drawn. You will still need a site plan showing how the structure sits on your property, which usually needs professional drafting.

If you want something the pre-approved models do not cover, you will need to engage an architect or a designer directly. We do not employ architects or designers and we do not draw plans ourselves, so your drawings need to be finished before we start building. Significant structural or floor plan changes can also take a project out of the City’s pre-approved programme altogether, which is worth checking before you commission anything.

How do I know if my lot in Tacoma is eligible for an ADU?

Most residential lots in Tacoma can take one, but confirm your own zoning rather than assuming. The City’s online mapping tools will show your zoning district, and the planning department is the definitive source on what your lot can carry.

Detached units go in the rear yard, at least 5 feet from a side property line — 8 feet where a main entrance faces that side — and 15 feet from the rear line, except that no setback is required from an alley. At least 10% of the lot has to stay usable open space. Lots with critical areas or their buffers are treated differently again. If your house sits in one of the nine historic districts, the historic standards take priority where they conflict with the building design standards.

What utilities are needed for a detached ADU?

A detached ADU needs its own water, sewer and electrical connections, with external sewer and water service connections required outside the unit. Depending on what is already there, your main service panel may need upgrading to carry the extra load.

The question that usually decides the cost is whether you are connecting to existing lines or need a new extension. We build those connections as part of the site work and to the standards the City and the utility providers set. Talk to the utility companies early — what they tell you about your street can change where the unit is best placed.

How do I choose the best ADU contractor in Tacoma?

Ask what they know about the rules that apply to your lot specifically, and listen for the caveats. A builder who tells you a pre-approved plan is pre-permitted, or that they can move your application along at the City, is telling you something that is not true.

Ask for their Washington L&I registration before you sign anything, and check it yourself. Ask them to walk you through the whole scope — site preparation, foundation, shell, utilities, finishes — and to say plainly which parts they do not do. We do not draw plans, we do not employ architects or engineers, and we do not deal with the City on your behalf. Any builder should be able to tell you where their work stops.

Contact Us

Ready to Start Your Project?

We work across Tacoma and Pierce County. Tell us where your lot is and what you are hoping to put behind the house.

house

Prairie Line ADU Co.

Detached Accessory Dwelling Unit Construction in Tacoma

Business Hours

Monday - Friday: 9:00 AM - 5:00 PM